IAC logo
IAC Assessment: NT0051
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0051
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2025
Principal Product Printed Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 192
Plant Area (Sq.Ft.) 87,000
Annual Production 332,603 Units
Production Hrs. Annual 3,276
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,961 1,825,600 kWh $0.04
Electricity Demand $72,010 6,441 kW-months/year $11.18
Electricity Fees $4,529 - $ -
Natural Gas $7,089 805 MMBtu $8.80
TOTAL ENERGY COSTS $154,589
RECOMMENDED SAVINGS* $149,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$98,944
Cost:
$80,000
- - - - - - $98,944 - -
-
kWh
-
-
kW-months/year
-
-
$
$98,944
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$32,918
Cost:
$193,830
$1,848 47,504 - - - - $31,070 - $1,848
47,504
kWh
-
-
kW-months/year
-
-
$
$31,070
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,814
Cost:
-
$6,240 160,530 $6,574 588 - - - - $6,240
160,530
kWh
$6,574
588
kW-months/year
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,603
Cost:
$6,709
- - - - $2,603 - - - -
-
kWh
-
-
kW-months/year
$2,603
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,986
Cost:
$5,609
$966 24,841 $1,020 91 - - - - $966
24,841
kWh
$1,020
91
kW-months/year
-
-
$
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$586
Cost:
-
$586 15,057 - - - - - - $586
15,057
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$149,850
Cost:
$286,148
$9,640 247,932 $7,594 679 $2,603 - $130,014 - $9,640
247,932
kWh
$7,594
679
kW-months/year
$2,603
-
$
$130,014
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost