IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0634 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $585 $250 Implemented
SD0634 # 06 Y:2023 06 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,780 $11,100 Implemented
SD0634 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,771 $108,198 Implemented
SD0634 # 04 Y:2023 04 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,998 $15,050 Implemented
SD0634 # 03 Y:2023 03 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,222 $2,580 Implemented
SD0634 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,518 $700 Implemented
SD0634 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $942 $3,568 Implemented
SF0587 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,467 $0 Implemented
SF0587 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,849 $3,482 Implemented
SF0587 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,769 $260 Implemented
SF0587 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $1,675 Implemented
SF0587 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $12,549 $55,774 Implemented
SF0587 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $34,250 $35,738 Implemented
SD0582 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,534 $9,736 Implemented
SD0582 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $342 $760 Implemented
SD0582 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,455 $8,348 Implemented
SD0582 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $24,520 $35,000 Implemented
SF0540 # 01 Y:2019 01 2019 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,623 $0 Implemented
SF0540 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,918 $19,682 Implemented
SF0540 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,740 $21,083 Implemented
SF0540 # 05 Y:2019 05 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $242 $688 Implemented
SF0540 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $0 Implemented
SF0540 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,339 $325 Implemented
SD0567 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $65 $150 Implemented
SD0567 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $266 $1,260 Implemented