IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0519 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $9,710 $691 Implemented
WV0519 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,274 $33,606 Implemented
WV0519 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,944 $155 Implemented
WV0519 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $45,119 $1,000 Implemented
WV0519 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,853 $50,000 Implemented
WV0519 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,974 $333 Implemented
WV0519 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,404 $4,258 Implemented
WV0519 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $161,462 $330,000 Implemented
WV0519 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,228 $0 Implemented
WV0467 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $45 Implemented
WV0467 # 11 Y:2013 11 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,059 $571 Implemented
WV0467 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $248 Implemented
WV0467 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,844 $500 Implemented
WV0467 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,901 $1,000 Implemented
WV0467 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,786 $2,550 Implemented
WV0322 # 11 Y:2005 11 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $687 $250 Implemented
WV0322 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $664 $248 Implemented
WV0322 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $525 Implemented
WV0322 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $0 Implemented
WV0322 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,038 $15,738 Implemented
WV0322 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,250 $468 Implemented
WV0322 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $22,045 $4,322 Implemented
WV0283 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $764 $0 Implemented
WV0283 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,561 $1,416 Implemented
WV0283 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,643 $1,290 Implemented