IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0098 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,024 $34,540 Not Implemented
UA0098 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,139 $22,860 Not Implemented
SU0340 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,153 $0 Implemented
SU0340 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $1,696 $1,150 Implemented
SU0340 # 03 Y:2013 03 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $60 $202 Not Implemented
SU0340 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,813 $15,885 Implemented
MA0706 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,814 $10,900 Implemented
MA0706 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,037 $6,900 Not Implemented
MA0706 # 03 Y:2013 03 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,016 $26,000 Implemented
MA0706 # 04 Y:2013 04 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,105 $100 Implemented
MA0706 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $864 $300 Not Implemented
MA0706 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $350 $450 Not Implemented
NC0482 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,366 $33,811 Implemented
NC0482 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,174 $132,415 Not Implemented
NC0482 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,539 $2,682 Not Implemented
NC0482 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,981 $2,248 Not Implemented
NC0482 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,540 $300,000 Not Implemented
NC0482 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,303 $4,000 Not Implemented
NC0482 # 07 Y:2013 07 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $14,522 $24,104 Not Implemented
NC0482 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,890 $100 Implemented
WV0465 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,796 $52,900 Implemented
WV0465 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,591 $44,160 Implemented
WV0465 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,229 $16,800 Implemented
WV0465 # 04 Y:2013 04 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,400 $6,350 Not Implemented
WV0465 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,786 $1,000 Implemented