Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0624 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,715 $1,161 Implemented
SD0624 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $828 Implemented
SD0624 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,290 $1,500 Implemented
SF0584 # 01 Y:2022 01 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,346 $2,177 Implemented
SF0584 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,882 $13,939 Implemented
SD0579 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,727 $0 Implemented
SD0579 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,229 $21,116 Implemented
SD0579 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $1,300 Implemented
SD0579 # 05 Y:2019 05 2019 USE PHOTOCELL CONTROLS $853 $1,600 Implemented
SF0476 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $7,038 $21,100 Implemented
SF0476 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,239 $121,403 Implemented
SF0476 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $0 Implemented
SF0476 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,817 $0 Implemented
SF0476 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,100 $280 Implemented
SF0476 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,163 $913 Implemented
SF0476 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,722 $386 Implemented
SF0476 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,324 $215 Implemented
SF0468 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,541 $0 Implemented
SF0468 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $2,043 $1,679 Implemented
SF0468 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,506 $8,348 Implemented
SF0468 # 10 Y:2015 10 2015 REPLACE BOILER $9,878 $51,914 Implemented
SF0468 # 07 Y:2015 07 2015 INSULATE BARE EQUIPMENT $356 $274 Implemented
SF0468 # 03 Y:2015 03 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,761 $0 Implemented
SF0468 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,141 $1,658 Implemented
SF0468 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,031 $8,158 Implemented