IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0467 # 08 Y:2019 08 2019 UPGRADE OBSOLETE EQUIPMENT $500 $5,000 Implemented
LE0467 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,990 $2,000 Implemented
LE0467 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $825 $70 Implemented
LE0467 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,568 $30,054 Implemented
LE0428 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $1,000 Implemented
LE0428 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $3,192 Implemented
LE0428 # 06 Y:2017 06 2017 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,118 $10,500 Implemented
LE0428 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,863 $10,608 Implemented
LE0400 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,729 $48,067 Implemented
LE0400 # 09 Y:2015 09 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,334 $16,500 Implemented
LE0400 # 07 Y:2015 07 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,457 $3,025 Implemented
LE0400 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,673 $1,000 Implemented
LE0400 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,648 $512 Implemented
LE0400 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,723 $28 Implemented
LE0400 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,188 $5,469 Implemented
LE0400 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,886 $69,160 Implemented
LE0400 # 14 Y:2015 14 2015 USE RADIANT HEATER FOR SPOT HEATING $5,902 $24,000 Implemented
LE0400 # 15 Y:2015 15 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,678 $6,940 Implemented
LE0400 # 16 Y:2015 16 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,312 $35,000 Implemented
LE0362 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,982 $12,000 Implemented
LE0362 # 07 Y:2013 07 2013 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $114,240 $200,000 Implemented
LE0362 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,545 $546 Implemented
LE0362 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $162,427 $899,500 Implemented
DL0065 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $3,970 $1,158 Implemented
DL0065 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $510 $50 Implemented