IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0228 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $9,605 $2,359 Implemented
IC0228 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,679 $14,948 Implemented
IC0214 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,278 $18,800 Implemented
IC0214 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,255 $68,455 Implemented
IC0214 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,132 $4,600 Implemented
IC0214 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $23,818 $40,641 Implemented
IP0086 # 01 Y:2017 01 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,463 $0 Implemented
IP0086 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $8 Implemented
IP0086 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $522 $204 Implemented
IP0086 # 13 Y:2017 13 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,424 $31,458 Implemented
UD0817 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $0 Implemented
UD0817 # 15 Y:2010 15 2010 INSULATE BARE EQUIPMENT $3,996 $0 Implemented
UD0817 # 13 Y:2010 13 2010 INSULATE BARE EQUIPMENT $21,893 $0 Implemented
UD0817 # 12 Y:2010 12 2010 COVER OPEN TANKS $10,386 $0 Implemented
UD0817 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $8,137 $0 Implemented
UD0817 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $628 $0 Implemented
UD0817 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,672 $600 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented
UD0699 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $255 Implemented
UD0699 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,162 $8,406 Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $775 $0 Implemented
IC0084 # 13 Y:2004 13 2004 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $197 $240 Implemented
IC0084 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $124,469 $513 Implemented