IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3312 Steel Product Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0961 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,730 $400 Implemented
OK0850 # 09 Y:2013 09 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $434 $2,080 Implemented
OK0850 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $906 $337 Implemented
OK0813 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $7,737 Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
OK0813 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $990 Implemented
OK0813 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,531 $65,527 Implemented
OK0813 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,231 $64,515 Implemented
OK0813 # 07 Y:2011 07 2011 OPTIMIZE PLANT POWER FACTOR $19,954 $13,110 Implemented
OK0813 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $1,037 $190 Implemented
OK0798 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $5,205 Implemented
OK0798 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $2,009 Implemented
OK0798 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,826 $900 Implemented
OK0798 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,240 $0 Implemented
OK0798 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,000 $0 Implemented
OK0798 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $8,199 $2,430 Implemented
OK0798 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $1,991 Implemented
OK0785 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,282 $55,440 Implemented
OK0785 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,602 $0 Implemented
OK0785 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $0 Implemented
OK0673 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,017 $1,000 Implemented
OK0673 # 04 Y:2003 04 2003 USE COMPRESSOR AIR FILTERS $7,440 $670 Implemented
OK0673 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,207 $1,007 Implemented