IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 3313 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0126 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,501 $780 Implemented
MZ0120 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,136 $119,770 Implemented
MZ0120 # 03 Y:2013 03 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,557 $31,200 Implemented
MZ0120 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $153 $190 Implemented
MZ0120 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $4,675 $1,100 Implemented
MZ0089 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,314 $1,810 Implemented
MZ0089 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,384 $8,860 Implemented
MZ0089 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,426 $1,160 Implemented
MZ0089 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $50,074 $11,000 Implemented
MZ0058 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,916 $0 Implemented
MZ0058 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,085 $1,300 Implemented
MZ0058 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $422,776 $140,000 Implemented
MZ0058 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,522 $22,400 Implemented
MZ0058 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,229 $41,660 Implemented
MZ0044 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,600 $850 Implemented
MZ0044 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $5,600 Implemented
MZ0044 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,991 $38,600 Implemented