IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0199 # 04 Y:2023 04 2023 USE COMPRESSOR AIR FILTERS $1,447 $2,189 Implemented
WM0199 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,795 $44,389 Implemented
WM0016 # 06 Y:2012 06 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,004 $0 Implemented
WM0016 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,517 $0 Implemented
WM0012 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $62 $128 Implemented
WM0012 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,999 $5,230 Implemented
WI0514 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,300 Implemented
WI0514 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,678 $0 Implemented
WI0514 # 02 Y:2006 02 2006 $9,074 $900 Implemented
WI0471 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,303 $15,076 Implemented
WI0471 # 02 Y:2004 02 2004 $5,108 $59,785 Implemented
WI0471 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,338 $800 Implemented
WI0471 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $640 Implemented
WI0443 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $341 $75 Implemented
WI0443 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $421 $640 Implemented
WI0443 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,215 $500 Implemented
WI0443 # 02 Y:2003 02 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $1,964 $4,500 Implemented
WI0443 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,583 $9,000 Implemented