IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0475 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,240 $0 Implemented
LE0475 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $12,830 Implemented
LE0475 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $200 Implemented
LE0328 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,383 $2,500 Implemented
LE0328 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,369 $15,675 Implemented
LE0328 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,650 $3,000 Implemented
LE0328 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,853 $18,000 Implemented
LE0328 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,435 $12,420 Implemented
LE0330 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $10,060 $600 Implemented
WV0376 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,345 $0 Implemented
WV0376 # 15 Y:2008 15 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $484 $200 Implemented
WV0376 # 14 Y:2008 14 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $196 Implemented
WV0376 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $963 $1,431 Implemented
WV0376 # 11 Y:2008 11 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,649 $0 Implemented
WV0376 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $387 Implemented
WV0376 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,750 $1,363 Implemented
WV0376 # 08 Y:2008 08 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,621 $425 Implemented
WV0376 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,318 $0 Implemented
WV0376 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,611 $7,140 Implemented
WV0376 # 04 Y:2008 04 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,524 $8,800 Implemented
WV0376 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $7,524 $5,130 Implemented
WV0376 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,887 $23,022 Implemented
WV0376 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,171 $21,771 Implemented
LE0254 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,686 $20,000 Implemented
LE0254 # 06 Y:2007 06 2007 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $5,988 $3,000 Implemented