IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0007 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,184 $5,993 Implemented
AM0824 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,660 $4,400 Implemented
AM0824 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $700 $360 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
AM0715 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,750 $50 Implemented
AM0715 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,530 $50,830 Implemented
AM0715 # 03 Y:2016 03 2016 USE SOLAR HEAT FOR HEAT $31,594 $151,288 Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0892 # 07 Y:2014 07 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $105 $28 Implemented
OK0892 # 08 Y:2014 08 2014 INSTALL TIMERS AND/OR THERMOSTATS $148 $160 Implemented
OK0892 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $167 $660 Implemented
OK0892 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,055 $560 Implemented
AM0621 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,680 $1,000 Implemented
AM0621 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,750 $11,600 Implemented
AM0563 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,075 $1,260 Implemented
AM0559 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,100 $225,000 Implemented
AM0559 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $15 Implemented
AM0559 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $7,700 $0 Implemented
AM0559 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,245 $500 Implemented
AM0559 # 05 Y:2009 05 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,810 $500 Implemented
AM0515 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $4,440 $1,580 Implemented
AM0515 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,500 $6,700 Implemented