Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 334416 Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0480 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,439 $20,587 Implemented
SU0480 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,917 $2,919 Implemented
SU0480 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $922 $899 Implemented
LE0464 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $114 $40 Implemented
LE0464 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $214 $40 Implemented
LE0464 # 03 Y:2018 03 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,836 $28,000 Implemented
LE0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,809 $23,000 Implemented
LE0464 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,187 $12,000 Implemented
SU0250 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $82 $0 Implemented
SU0250 # 13 Y:2007 13 2007 INSTALL OCCUPANCY SENSORS $157 $321 Implemented
SU0250 # 11 Y:2007 11 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $36 Implemented
SU0250 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $727 $519 Implemented
SU0250 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,604 $3,502 Implemented
SU0250 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $587 Implemented
SU0250 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,654 $425 Implemented
SU0250 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Implemented
SU0250 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $0 Implemented
SU0219 # 12 Y:2005 12 2005 ADD AREA LIGHTING SWITCHES $4,267 $10,645 Implemented
SU0219 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $6,107 $5,363 Implemented
SU0219 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,948 $721 Implemented
SU0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,286 $502 Implemented
SU0219 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,356 $0 Implemented
SU0219 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,621 $0 Implemented