IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
NT0002 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $2,499 Implemented
NT0002 # 05 Y:2023 05 2023 ELIMINATE/REDUCE AN OPERATION $9,631 $0 Implemented
NT0002 # 04 Y:2023 04 2023 INSTALL SET-BACK TIMERS $1,504 $0 Implemented
NT0002 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $5,801 Implemented
NT0002 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,880 $7,474 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,707 $6,472 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
AM0830 # 04 Y:2021 04 2021 USE PHOTOCELL CONTROLS $2,760 $460 Implemented
AM0830 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,300 $25 Implemented
AM0830 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $11,150 $0 Implemented
AM0830 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,740 $1,170 Implemented
OK1054 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $2,505 Implemented
OK1054 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $624 $2,620 Implemented
OK1053 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,980 $0 Implemented
OK1053 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,462 $16,440 Implemented
OK1053 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,155 $26,670 Implemented
OK1053 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,190 Implemented