IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0428 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,867 $1,660 Implemented
MI0428 # 03 Y:2023 03 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,729 $0 Implemented
MI0428 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,014 $960 Implemented
MI0428 # 10 Y:2023 10 2023 INSTALL OCCUPANCY SENSORS $1,117 $816 Implemented
MI0428 # 09 Y:2023 09 2023 UPGRADE CONTROLS ON COMPRESSORS $1,230 $40 Implemented
MI0428 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $2,834 Implemented
MI0428 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $18,313 $3,360 Implemented
MI0428 # 11 Y:2023 11 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $898 $98 Implemented
UF0578 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,829 $2,419 Implemented
UF0578 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,842 $11,742 Implemented
UF0578 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $0 Implemented
UF0578 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,065 $1,710 Implemented
UF0578 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,461 $390 Implemented
UF0578 # 05 Y:2022 05 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,688 $0 Implemented
MI0394 # 08 Y:2021 08 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,367 $2,549 Implemented
MI0394 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $24,463 $480 Implemented
MI0394 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,427 $1,980 Implemented
MI0391 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $3,068 $1,728 Implemented
MI0391 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,882 $1,980 Implemented
MI0391 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,293 $2,100 Implemented
MI0389 # 04 Y:2021 04 2021 INSTALL EFFICIENT RECTIFIERS $21,196 $55,920 Implemented
MI0389 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $43,876 $480 Implemented
MI0389 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,739 $33,655 Implemented
MI0389 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,025 $120 Implemented
MI0389 # 08 Y:2021 08 2021 USE COMPRESSOR AIR FILTERS $1,420 $1,100 Implemented