IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0587 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,112 $300 Implemented
WV0587 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $5,261 $650 Implemented
WV0587 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,563 $600 Implemented
WV0587 # 11 Y:2019 11 2019 INSULATE BARE EQUIPMENT $2,257 $2,624 Implemented
WV0587 # 12 Y:2019 12 2019 INSTALL OCCUPANCY SENSORS $1,787 $1,750 Implemented
WV0587 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,887 $4,500 Implemented
WV0583 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $507 $270 Implemented
WV0583 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $1,265 $582 Implemented
WV0583 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,271 $607 Implemented
WV0583 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,448 $0 Implemented
WV0583 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,446 $28 Implemented
WV0583 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,290 $53,184 Implemented
WV0449 # 04 Y:2012 04 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,821 $1,000 Implemented
WV0449 # 07 Y:2012 07 2012 DEVELOP A REPAIR/REPLACE POLICY $2,133 $637 Implemented
WV0449 # 14 Y:2012 14 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $133 $500 Implemented
WV0449 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,929 $13,233 Implemented
WV0449 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,722 $23,208 Implemented
WV0368 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $181 $60 Implemented
WV0368 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $747 $1,927 Implemented
WV0368 # 02 Y:2008 02 2008 ELIMINATE/REDUCE AN OPERATION $1,977 $1,750 Implemented
WV0368 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $11,312 $2,971 Implemented