IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0481 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,057 $40 Implemented
LE0481 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,547 $11,688 Implemented
LE0481 # 05 Y:2019 05 2019 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $50,429 $162,000 Implemented
LE0481 # 07 Y:2019 07 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,688 $55,000 Implemented
LE0481 # 09 Y:2019 09 2019 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,850 Implemented
LE0462 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,915 $1,000 Implemented
LE0462 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $355 Implemented
LE0462 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,454 $24,417 Implemented
LE0459 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,864 $13,360 Implemented
LE0459 # 02 Y:2018 02 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,140 $9,000 Implemented
LE0459 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,564 $8,400 Implemented
LE0285 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,391 $50 Implemented
LE0285 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,389 $1,525 Implemented
SU0221 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 Implemented
SU0221 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $96 $391 Implemented
SU0221 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,388 $2,015 Implemented
SU0221 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $1,155 Implemented
SU0221 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $259 $721 Implemented
SU0221 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,455 $0 Implemented
SU0221 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $1,767 $0 Implemented
SU0221 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,043 $0 Implemented
LE0177 # 04 Y:2004 04 2004 USE OPTIMUM THICKNESS INSULATION $516 $585 Implemented
LE0177 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,194 $0 Implemented