IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,689

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0203 # 15 Y:1991 15 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,000 $1,700 Implemented
CO0203 # 16 Y:1991 16 1991 INSULATE BARE EQUIPMENT $1,300 $1,800 Implemented
CO0205 # 01 Y:1991 01 1991 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $10,700 $6,500 Not Implemented
CO0205 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,331 $2,240 Not Implemented
CO0205 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,600 $500 Not Implemented
CO0205 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,100 $2,000 Not Implemented
CO0205 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,600 $400 Not Implemented
CO0205 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,300 $3,100 Not Implemented
CO0205 # 07 Y:1991 07 1991 INSTALL TIMERS AND/OR THERMOSTATS $440 $300 Not Implemented
AM0112 # 01 Y:1991 01 1991 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,470 $5,000 Not Implemented
AM0112 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,670 $19,000 Not Implemented
AM0112 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $3,900 $365 Not Implemented
AM0112 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $310 Not Implemented
AM0112 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $195 $235 Not Implemented
MA0201 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 03 Y:1991 03 1991 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $159,131 $425,925 Not Implemented
MA0201 # 04 Y:1991 04 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,784 $500 Not Implemented
OR0100 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,304 $0 Implemented
OR0100 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,888 $2,677 Not Implemented
OR0100 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,591 $2,350 Not Implemented
OR0100 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $6,420 $13,800 Implemented
KU0329 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,299 $1,500 Implemented
KU0329 # 02 Y:1990 02 1990 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,269 $6,000 Implemented
KU0329 # 03 Y:1990 03 1990 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,435 $9,600 Not Implemented