IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0884 # 12 Y:2013 12 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,101 $0 Implemented
UD0884 # 11 Y:2013 11 2013 AVOID FROST FORMATION ON EVAPORATORS $1,417 $0 Implemented
UD0884 # 10 Y:2013 10 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,365 $11,824 Implemented
UD0884 # 09 Y:2013 09 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,533 $2,000 Implemented
UD0884 # 08 Y:2013 08 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,876 $0 Implemented
UD0884 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,470 $0 Implemented
UD0884 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,058 $500 Implemented
UD0884 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $936 $500 Implemented
UD0884 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,400 $19,000 Implemented
UD0884 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,136 $7,000 Implemented
UD0884 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $19,350 Implemented
UD0884 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $9,148 $1,000 Implemented
UD0873 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $23,496 $50,000 Implemented
UD0873 # 07 Y:2013 07 2013 USE RADIANT HEATER FOR SPOT HEATING $1,809 $0 Implemented
UD0873 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $680 $1,050 Implemented
UD0873 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,732 $9,904 Implemented
UD0873 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $1,443 $2,400 Implemented
UD0873 # 01 Y:2013 01 2013 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,346 $0 Implemented
UD0797 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,489 $48,750 Implemented
UD0797 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,034 $1,000 Implemented
UD0797 # 09 Y:2009 09 2009 DISCONNECT BALLASTS $858 $0 Implemented
TN0426 # 01 Y:1991 01 1991 USE MINIMUM STEAM OPERATING PRESSURE $10,911 $500 Implemented
TN0426 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $940 Implemented
TN0426 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $400 Implemented
TN0426 # 03 Y:1991 03 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $897 $25 Implemented