IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0046 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $3,053 $30 Implemented
BS0046 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $876 $2,756 Implemented
BS0046 # 06 Y:2014 06 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,235 $752 Implemented
BS0046 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $401 $922 Implemented
BS0046 # 08 Y:2014 08 2014 REPAIR OR REPLACE STEAM TRAPS $25,901 $50,324 Implemented
BS0046 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,395 $84 Implemented
BS0046 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $91 $341 Implemented
BS0046 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,944 $70,000 Implemented
BS0046 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,312 $58,240 Implemented
OR0612 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $922 Implemented
OR0612 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,184 $10,125 Implemented
OR0612 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $7,387 $13,420 Implemented
UW0045 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,260 $220 Implemented
UW0045 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $28,362 Implemented
UW0045 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $1,930 Implemented
UW0044 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,619 $168,530 Implemented
UW0044 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $1,780 Implemented
UW0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,804 $7,172 Implemented
UW0005 # 02 Y:2007 02 2007 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $15,876 $4,452 Implemented
UW0005 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,388 $2,619 Implemented
UW0005 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,246 $1,162 Implemented
UW0005 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $398 Implemented
UW0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,766 $432 Implemented
OR0497 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,700 $39,000 Implemented
OR0497 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $2,550 Implemented