IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0538 # 04 Y:2019 04 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,964 $6,180 Implemented
UF0538 # 03 Y:2019 03 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,027 $7,692 Implemented
UF0538 # 02 Y:2019 02 2019 INSTALL SKYLIGHTS $11,989 $45,500 Implemented
UF0538 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,744 $52,547 Implemented
MI0248 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,983 $30,489 Implemented
MI0248 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,449 $2,300 Implemented
MI0248 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,241 $1,660 Implemented
MI0248 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,180 $80 Implemented
MI0248 # 07 Y:2013 07 2013 PAY BILLS ON TIME TO AVOID LATE FEES $1,005 $240 Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
MI0106 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,418 $225 Implemented
MI0106 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,390 $56 Implemented
MI0106 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $862 Implemented
MI0106 # 01 Y:2005 01 2005 $19,885 $760 Implemented
UF0331 # 09 Y:2003 09 2003 $2,340 $2,372 Implemented
UF0331 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $924 $1,649 Implemented
UF0331 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Implemented
UF0331 # 05 Y:2003 05 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,190 $32,481 Implemented
UF0331 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,837 $11,405 Implemented
UF0331 # 08 Y:2003 08 2003 $7,000 $3,000 Implemented
UF0331 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,357 $18,567 Implemented
UF0331 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,423 $0 Implemented