IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 243 Millwork, Plywood & Structural
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0644 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $21 $31 Implemented
WV0644 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $76 $368 Implemented
WV0644 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $310 $592 Implemented
WV0644 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $1,293 Implemented
WV0644 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $523 $1,573 Implemented
WV0644 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $100 Implemented
WV0644 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $954 $1,965 Implemented
WV0644 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,500 $1,023 Implemented
WV0399 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,889 $0 Implemented
WV0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $2,955 $3,544 Implemented
WV0399 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,812 $0 Implemented
WV0399 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $18,121 $1,644 Implemented
WV0399 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,930 $39,900 Implemented
WV0399 # 03 Y:2010 03 2010 COVER OPEN TANKS $83,144 $7,290 Implemented
WV0399 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,515 $1,717 Implemented
WV0399 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,930 $1,000 Implemented
WV0303 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $171 $303 Implemented
WV0303 # 11 Y:2004 11 2004 RECOVER WASTE HEAT FROM EQUIPMENT $816 $515 Implemented
WV0303 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,061 $414 Implemented
WV0303 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,770 $236 Implemented
WV0303 # 07 Y:2004 07 2004 USE SYNTHETIC LUBRICANT $1,981 $560 Implemented
WV0303 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $618 Implemented
WV0303 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $8,537 Implemented
WV0303 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $8,151 $458 Implemented
WV0267 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $150 Implemented