IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0385 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $1,423 $3,996 Implemented
UM0361 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $750 Implemented
UM0361 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $396 $400 Implemented
UM0361 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,137 $5,520 Implemented
UM0361 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,000 $31,000 Implemented
UM0361 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,484 $1,200 Implemented
UM0361 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,522 $600 Implemented
UM0361 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,227 $650 Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
UM0210 # 01 Y:2002 01 2002 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $43,964 $148,000 Implemented
UM0210 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,037 $6,600 Implemented
UM0210 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,984 $450 Implemented
UM0210 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $778 $900 Implemented
ND0160 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,871 $330 Implemented
ND0160 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $100 Implemented
ND0160 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $830 $250 Implemented
ND0160 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $488 $1,250 Implemented
ND0152 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $360 Implemented
ND0038 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $7,544 $20,000 Implemented
ND0038 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,882 $500 Implemented
ND0031 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,015 $23,670 Implemented