IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0547 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $846 $400 Implemented
LE0547 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $602 $1,720 Implemented
LE0547 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $13,930 Implemented
LE0523 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,840 $380 Implemented
LE0523 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,176 $2,600 Implemented
LE0523 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,439 $4,040 Implemented
LE0523 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $901 $2,000 Implemented
DL0020 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,334 $34,037 Implemented
DL0020 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $350 Implemented
LE0266 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $42,137 $2,614 Implemented
LE0248 # 05 Y:2007 05 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,500 $2,500 Implemented
LE0248 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,065 $11,000 Implemented
LE0248 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,990 $400 Implemented
LE0248 # 08 Y:2007 08 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $613 $20 Implemented
LE0248 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,674 $25,073 Implemented
LE0202 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $220 $0 Implemented
LE0202 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $397 $500 Implemented
LE0202 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $879 $0 Implemented
LE0202 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $2,500 Implemented
LE0202 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,420 $13,640 Implemented
HO0223 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $513 $0 Implemented
HO0223 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $1,500 Implemented
HO0223 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,692 $400 Implemented
HO0223 # 08 Y:2000 08 2000 AIR CONDITION ONLY SPACE NECESSARY $5,049 $300 Implemented
HO0223 # 10 Y:2000 10 2000 $2,400 $2,600 Implemented