IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0298 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,504 $7,050 Not Implemented
OR0298 # 04 Y:1997 04 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,760 $18,000 Not Implemented
OR0298 # 05 Y:1997 05 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $17,480 $2,870 Not Implemented
OR0298 # 06 Y:1997 06 1997 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,600 $81,640 Not Implemented
OR0298 # 07 Y:1997 07 1997 OPTIMIZE PLANT POWER FACTOR $1,350 $3,375 Not Implemented
MA0396 # 01 Y:1997 01 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,580 $9,347 Not Implemented
MA0396 # 02 Y:1997 02 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,492 $11,700 Implemented
MA0396 # 03 Y:1997 03 1997 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $4,207 $14,329 Not Implemented
MA0396 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,606 $75 Implemented
MA0396 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,409 $60 Implemented
MA0396 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $102 Not Implemented
MA0396 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $182 $132 Not Implemented
MS0092 # 01 Y:1997 01 1997 RECOVER WASTE HEAT FROM EQUIPMENT $6,178 $1,863 n/a
MS0092 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $420 $364 n/a
MS0092 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $4,351 n/a
MS0092 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $19,015 $33,000 n/a
MS0092 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,493 $0 n/a
MS0092 # 06 Y:1997 06 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $7,975 $10,000 n/a
MS0092 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,093 $0 n/a
HO0160 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,846 $18,908 Not Implemented
HO0160 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,510 $1,021 Not Implemented
HO0160 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,379 $3,500 Not Implemented
HO0160 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,433 $800 Not Implemented
HO0160 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,014 $100 Not Implemented
HO0160 # 06 Y:1997 06 1997 PURCHASE EQUIPMENT INSTEAD OF LEASING $55,900 $15,000 Implemented