IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0250 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $4,150 Implemented
IC0250 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,708 $10,610 Implemented
IC0250 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $473 $0 Implemented
IC0250 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $688 $762 Implemented
BD0461 # 16 Y:2015 16 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $230 $20 Implemented
BD0461 # 14 Y:2015 14 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $486 Implemented
BD0461 # 11 Y:2015 11 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $20 Implemented
BD0461 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,781 $2,625 Implemented
BD0461 # 07 Y:2015 07 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,986 $1,600 Implemented
BD0461 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $2,850 $900 Implemented
BD0461 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,889 $1,000 Implemented
BD0461 # 02 Y:2015 02 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $11,376 $1,000 Implemented
BD0268 # 13 Y:2004 13 2004 $861 $173 Implemented
BD0268 # 12 Y:2004 12 2004 USE LESS WASTEFUL PACKAGING $1,586 $3,600 Implemented
BD0268 # 11 Y:2004 11 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,653 $6,914 Implemented
BD0268 # 10 Y:2004 10 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $461 $20 Implemented
BD0268 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,701 $1,500 Implemented
BD0268 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $200 Implemented
BD0268 # 04 Y:2004 04 2004 HEAT WATER WITH EXHAUST HEAT $31,790 $35,000 Implemented
BD0268 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $40,434 $49,000 Implemented
BD0268 # 02 Y:2004 02 2004 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $81,415 $130,000 Implemented
BD0268 # 01 Y:2004 01 2004 AIR CONDITION ONLY SPACE NECESSARY $352,557 $1,500,000 Implemented
BD0182 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,936 $700 Implemented
BD0182 # 11 Y:2001 11 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $14,925 $1,000 Implemented
BD0182 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,069 $5,000 Implemented