IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0082 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $866 $0 Implemented
IP0082 # 03 Y:2017 03 2017 PAY BILLS ON TIME TO AVOID LATE FEES $828 $0 Implemented
IP0082 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $24,829 $2,670 Implemented
IP0082 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $3,769 $3,724 Implemented
IP0082 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,194 $19,486 Implemented
IP0082 # 10 Y:2017 10 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $134 $270 Implemented
IP0082 # 12 Y:2017 12 2017 OPTIMIZE PLANT POWER FACTOR $7,316 $21,686 Implemented
IP0082 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $86 $0 Implemented
IP0040 # 02 Y:2015 02 2015 APPLY FOR INVESTMENT INCENTIVES $1,728 $0 Implemented
IP0040 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,452 $99 Implemented
IP0030 # 01 Y:2014 01 2014 INSTALL SET-BACK TIMERS $4,377 $35 Implemented
IP0030 # 02 Y:2014 02 2014 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,730 $124 Implemented
IP0030 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,493 $280 Implemented
IP0030 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $442 $227 Implemented
IP0001 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,247 $0 Implemented
IP0001 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $93 $0 Implemented
IP0001 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $8,348 Implemented
IP0001 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,942 $80,000 Implemented
UD0748 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,200 $840 Implemented
UD0748 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $7,546 $0 Implemented
UD0748 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $108 Implemented
UD0723 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,315 $13,340 Implemented
UD0723 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,126 $7,000 Implemented
UD0723 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,573 $0 Implemented
UD0723 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,309 $0 Implemented