Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
256
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0594 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,918 | $756 | Implemented |
UF0594 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,181 | $6,536 | Implemented |
MI0422 # 04 Y:2023 | 04 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,309 | $280 | Implemented |
MI0422 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,293 | $580 | Implemented |
MI0422 # 05 Y:2023 | 05 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,579 | $4,001 | Implemented |
MI0422 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $394 | $0 | Implemented |
UF0592 # 04 Y:2023 | 04 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,287 | $18,600 | Implemented |
UF0592 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,274 | $30,607 | Implemented |
UF0592 # 10 Y:2023 | 10 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $62,417 | $10,000 | Implemented |
UF0592 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,580 | $600 | Implemented |
UF0592 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,922 | $11,796 | Implemented |
UF0592 # 08 Y:2023 | 08 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,672 | $1,200 | Implemented |
UF0592 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $56,023 | $88,370 | Implemented |
UF0592 # 07 Y:2023 | 07 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,981 | $508 | Implemented |
MI0407 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,291 | $580 | Implemented |
MI0407 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $7,899 | Implemented |
MI0390 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,273 | $1,040 | Implemented |
MI0390 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,477 | Implemented |
UF0531 # 02 Y:2019 | 02 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,581 | $89,000 | Implemented |
UF0531 # 03 Y:2019 | 03 | 2019 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $17,787 | $43,500 | Implemented |
UF0531 # 01 Y:2019 | 01 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $19,490 | $2,150 | Implemented |
UF0531 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,473 | $7,866 | Implemented |
UF0531 # 06 Y:2019 | 06 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,675 | $667 | Implemented |
UF0531 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $2,072 | $195 | Implemented |
UF0525 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,580 | $31,585 | Implemented |