IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0396 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,908 $2,020 Implemented
MI0396 # 01 Y:2021 01 2021 PAY UTILITY BILLS ON TIME $27,408 $0 Implemented
MI0351 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,493 $11,078 Implemented
MI0351 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,064 $2,020 Implemented
MI0351 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $87,352 $12,000 Implemented
MI0351 # 09 Y:2019 09 2019 ISOLATE HOT OR COLD EQUIPMENT $508 $600 Implemented
MI0351 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $6,022 $600 Implemented
MI0351 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $14,048 $820 Implemented
MI0351 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $38,747 $480 Implemented
MI0317 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,683 $1,885 Implemented
MI0317 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,418 $1,660 Implemented
MI0317 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,568 $120 Implemented
MI0317 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,556 $8,294 Implemented
MI0317 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $33,420 $46,515 Implemented
MI0232 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,023 $480 Implemented
MI0232 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $53,657 $2,600 Implemented
MI0232 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,045 $640 Implemented
MI0232 # 10 Y:2012 10 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,094 $793 Implemented
MI0232 # 09 Y:2012 09 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,079 $3,331 Implemented