IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3082 Unsupported Plastics Profile Shapes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0807 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,275 $2,000 Implemented
UD0807 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $1,000 Implemented
UD0807 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,425 $8,602 Implemented
UD0807 # 12 Y:2009 12 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,249 $4,614 Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
WV0317 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,041 $60 Implemented
WV0317 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,217 $490 Implemented
WV0317 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $761 $205 Implemented
WV0317 # 13 Y:2005 13 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $400 $240 Implemented
WV0317 # 09 Y:2005 09 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,086 $2,295 Implemented
WV0317 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $1,219 $2,680 Implemented
WV0317 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,392 $855 Implemented
WV0317 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $4,285 $128 Implemented
WV0317 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,531 $680 Implemented
WV0309 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $9,618 $1,147 Implemented
WV0309 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,338 $550 Implemented
WV0309 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,461 $760 Implemented
WV0309 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,239 $8,590 Implemented
WV0309 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,140 $98 Implemented
WV0309 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,646 $232 Implemented
WV0309 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,551 $19 Implemented
WV0309 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,138 $0 Implemented
WV0309 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,066 $507 Implemented
WV0309 # 11 Y:2005 11 2005 DEVELOP A REPAIR/REPLACE POLICY $1,012 $133 Implemented
WV0070 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,743 $500 Implemented