Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
130
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0594 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,918 | $756 | Implemented |
UF0594 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,181 | $6,536 | Implemented |
MI0422 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,293 | $580 | Implemented |
MI0422 # 05 Y:2023 | 05 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,579 | $4,001 | Implemented |
MI0422 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $394 | $0 | Implemented |
MI0422 # 04 Y:2023 | 04 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,309 | $280 | Implemented |
MI0390 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,273 | $1,040 | Implemented |
MI0390 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $3,477 | Implemented |
UF0531 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $2,072 | $195 | Implemented |
UF0531 # 02 Y:2019 | 02 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,581 | $89,000 | Implemented |
UF0531 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,473 | $7,866 | Implemented |
UF0531 # 06 Y:2019 | 06 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,675 | $667 | Implemented |
UF0531 # 01 Y:2019 | 01 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $19,490 | $2,150 | Implemented |
UF0531 # 03 Y:2019 | 03 | 2019 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $17,787 | $43,500 | Implemented |
UF0525 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,580 | $31,585 | Implemented |
UF0525 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,145 | $3,960 | Implemented |
UF0525 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,312 | $464 | Implemented |
UF0525 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,245 | $18,331 | Implemented |
UF0525 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,084 | $4,798 | Implemented |
UF0524 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,330 | $139,780 | Implemented |
UF0524 # 07 Y:2019 | 07 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,897 | $0 | Implemented |
UF0524 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,978 | $400 | Implemented |
UF0524 # 09 Y:2019 | 09 | 2019 | TREAT AND REUSE RINSE WATERS | $17,615 | $0 | Implemented |
MI0343 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,400 | $71,328 | Implemented |
MI0343 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,552 | $7,675 | Implemented |