Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
201
matching recommendationsSIC | 33 | Primary Metal Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0319 # 02 Y:2021 | 02 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,278 | $240 | Implemented |
MZ0319 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $687 | $800 | Implemented |
MZ0319 # 06 Y:2021 | 06 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $13,167 | $45,756 | Implemented |
MZ0319 # 08 Y:2021 | 08 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,401 | $25,720 | Implemented |
MZ0319 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,286 | $480 | Implemented |
MZ0319 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,762 | $4,140 | Implemented |
MZ0319 # 03 Y:2021 | 03 | 2021 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,002 | $600 | Implemented |
MZ0269 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $6,600 | Implemented |
MZ0269 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,409 | $250 | Implemented |
MZ0254 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,856 | $10,840 | Implemented |
MZ0254 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM THICKNESS INSULATION | $49,702 | $20,960 | Implemented |
MZ0254 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,434 | $10,000 | Implemented |
MZ0254 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $180 | Implemented |
MZ0254 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $384 | $1,000 | Implemented |
MZ0254 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,370 | $57,615 | Implemented |
MZ0254 # 05 Y:2018 | 05 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,499 | $52,000 | Implemented |
MZ0224 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,978 | $2,200 | Implemented |
MZ0224 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,705 | $1,263 | Implemented |
MZ0224 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $474 | $663 | Implemented |
MZ0193 # 03 Y:2015 | 03 | 2015 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $62,777 | $37,500 | Implemented |
MZ0193 # 01 Y:2015 | 01 | 2015 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $21,804 | $700 | Implemented |
MZ0193 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,714 | $1,160 | Implemented |
MZ0152 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,003 | $9,000 | Implemented |
MZ0152 # 02 Y:2014 | 02 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $833 | $690 | Implemented |
MZ0152 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,092 | $1,160 | Implemented |