IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0094 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,740 $120 Implemented
BS0094 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,142 $30,425 Implemented
OR0683 # 03 Y:2017 03 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,107 $670 Implemented
OR0683 # 01 Y:2017 01 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $19,831 $19,940 Implemented
BS0065 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,229 $46,340 Implemented
BS0065 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,088 $160 Implemented
BS0065 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $15 Implemented
OR0592 # 03 Y:2012 03 2012 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $40,400 $70,000 Implemented
OR0592 # 04 Y:2012 04 2012 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $15,020 $0 Implemented
UW0019 # 01 Y:2008 01 2008 REPLACE BOILER $16,074 $25,870 Implemented
OR0509 # 08 Y:2006 08 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,200 $3,000 Implemented
OR0509 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $7,000 $11,000 Implemented
OR0509 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $660 $240 Implemented
OR0509 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,200 $2,250 Implemented
OR0509 # 02 Y:2006 02 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $58,000 $6,800 Implemented
OR0509 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,900 $5,000 Implemented
OR0397 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,929 $1,568 Implemented
OR0397 # 02 Y:2001 02 2001 UPGRADE CONTROLS ON COMPRESSORS $9,700 $18,800 Implemented
OR0397 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $5,500 Implemented
OR0257 # 01 Y:1996 01 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $227 $0 Implemented
OR0257 # 03 Y:1996 03 1996 RECOVER AND REUSE COOLING WATER $3,097 $4,300 Implemented
OR0257 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,254 $7,414 Implemented
OR0239 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $300 $807 Implemented
OR0239 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,398 $3,350 Implemented
OR0234 # 04 Y:1995 04 1995 RECYCLE CASTING SAND $9,746 $12,960 Implemented