Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
UF0575 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $200,000 $0 Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
MI0361 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,278 $17,214 Implemented
MI0361 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,612 $160 Implemented
MI0361 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,145 $1,980 Implemented
MI0361 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $17,548 $3,600 Implemented
MI0361 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,647 $100,030 Implemented
MI0357 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,267 $1,195 Implemented
MI0357 # 08 Y:2019 08 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $996 $2,040 Implemented
MI0357 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $160 Implemented
MI0357 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $3,600 Implemented
MI0357 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,689 $1,980 Implemented
MI0357 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,870 $8,000 Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented