IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1043 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $331 $1,650 Implemented
OK1043 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,309 $35,400 Implemented
OK1043 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,397 $2,946 Implemented
OK1043 # 01 Y:2021 01 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,091 $8,000 Implemented
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
OK0954 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $84,389 $6,066 Implemented
OK0954 # 05 Y:2016 05 2016 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,862 $3,640 Implemented
OK0885 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,502 $2,889 Implemented
OK0885 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $10,088 $12,319 Implemented
OK0885 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $1,900 Implemented
MZ0129 # 11 Y:2013 11 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,450 $0 Implemented
MZ0129 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $1,800 Implemented
MZ0129 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $998 $190 Implemented
MZ0129 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,763 $63,637 Implemented
MZ0129 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $56,550 $18,200 Implemented
MZ0129 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,580 $267,500 Implemented
MZ0129 # 04 Y:2013 04 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,563 $760 Implemented
OK0802 # 10 Y:2010 10 2010 COMBINE UTILITY METERS $936 $175 Implemented
OK0802 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,918 $2,775 Implemented
OK0802 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $11,414 $51,875 Implemented
OK0802 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,998 $13,149 Implemented
OK0802 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,400 $1,550 Implemented
OK0802 # 07 Y:2010 07 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $30,411 $45,000 Implemented
OK0802 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,800 $15,600 Implemented