IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0723 # 02 Y:2014 02 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $20,745 $110,500 Implemented
MA0723 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,628 $5,000 Implemented
MA0723 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $1,250 Implemented
MA0723 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,304 $90,000 Implemented
MA0563 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $116 $0 Implemented
MA0563 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,769 $650 Implemented
MA0563 # 01 Y:2004 01 2004 $39,550 $12,000 Implemented
ME0238 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,637 $0 Implemented
ME0238 # 08 Y:1998 08 1998 PAY UTILITY BILLS ON TIME $87 $0 Implemented
ME0238 # 07 Y:1998 07 1998 PAY UTILITY BILLS ON TIME $176 $0 Implemented
ME0238 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $747 $2,209 Implemented
ME0238 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $17,669 Implemented
ME0227 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,383 $7,504 Implemented
ME0227 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $359 $100 Implemented
ME0227 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $790 $960 Implemented
ME0227 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $515 $588 Implemented
ME0227 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $408 $75 Implemented
ME0227 # 03 Y:1997 03 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $756 $0 Implemented
ME0227 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $185 Implemented
ME0227 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $540 $1,188 Implemented
ME0226 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,140 $11,689 Implemented
ME0226 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,451 $1,500 Implemented
ME0226 # 10 Y:1997 10 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,892 $12,000 Implemented
ME0226 # 11 Y:1997 11 1997 RECOVER AND REUSE COOLING WATER $661 $376 Implemented
ME0226 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,178 $1,300 Implemented