IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0593 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $62,208 $25,500 Implemented
UF0593 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $97,641 $400,000 Implemented
UF0593 # 09 Y:2023 09 2023 LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA $36,476 $11,225 Implemented
UF0593 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $110,377 $92,132 Implemented
UF0593 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,604 $0 Implemented
UF0593 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $131,807 $215,600 Implemented
UF0593 # 08 Y:2023 08 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $121,588 $12,000 Implemented
UF0593 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,641 $136,253 Implemented
MI0423 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,808 $580 Implemented
MI0423 # 10 Y:2023 10 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $277 $1,360 Implemented
MI0423 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,513 $51,984 Implemented
MI0423 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $41,834 $0 Implemented
MI0423 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,785 $37,678 Implemented
MI0423 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $4,508 $1,250 Implemented
MI0423 # 08 Y:2023 08 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,131 $1,500 Implemented
MI0421 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $670 $1,980 Implemented
MI0421 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,009 $0 Implemented
MI0421 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $2,695 $1,365 Implemented
MI0421 # 07 Y:2023 07 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,466 $1,492 Implemented
MI0421 # 05 Y:2023 05 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $49,124 $120 Implemented
UF0589 # 14 Y:2023 14 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,316 $3,069 Implemented
UF0589 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $920,434 $2,793,000 Implemented
UF0589 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,787 $43,077 Implemented
UF0589 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $71,810 $25,340 Implemented
UF0589 # 06 Y:2023 06 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $18,200 $14,400 Implemented