IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0587 # 12 Y:2019 12 2019 INSTALL OCCUPANCY SENSORS $1,787 $1,750 Implemented
WV0587 # 11 Y:2019 11 2019 INSULATE BARE EQUIPMENT $2,257 $2,624 Implemented
WV0587 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,563 $600 Implemented
WV0587 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $5,261 $650 Implemented
WV0587 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,112 $300 Implemented
WV0587 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,887 $4,500 Implemented
WV0341 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $1,270 Implemented
WV0341 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,388 $625 Implemented
WV0341 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,679 $543 Implemented
WV0341 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $1,800 Implemented
WV0341 # 01 Y:2006 01 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,713 $2,370 Implemented
WV0341 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $501 $213 Implemented
WV0341 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $0 Implemented
WV0117 # 12 Y:1997 12 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,387 $0 Implemented
WV0117 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,160 $200 Implemented
WV0117 # 11 Y:1997 11 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $453 $0 Implemented
WV0117 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,795 $200 Implemented
WV0117 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $30 Implemented
WV0117 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,793 $3,114 Implemented
WV0117 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,328 $484 Implemented
WV0029 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,087 $1,173 Implemented
WV0029 # 10 Y:1994 10 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $207 $0 Implemented
WV0029 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $303 Implemented
WV0029 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $192 $15 Implemented
WV0029 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $279 $0 Implemented