IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,735

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0111 # 06 Y:1994 06 1994 USE CASCADE SYSTEM OF RECIRCULATING DURING COLD WEATHER TO AVOID SUB-COOLING $4,008 $12,000 n/a
AS0111 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $749 $500 n/a
AS0111 # 08 Y:1994 08 1994 USE SYNTHETIC LUBRICANT $1,758 $2,330 n/a
AS0111 # 09 Y:1994 09 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $2,000 n/a
SF0020 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,431 $11,437 Implemented
SF0020 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,920 $9,089 Implemented
SF0020 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $3,335 $1,851 Not Implemented
SF0020 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,006 $0 Implemented
SF0020 # 05 Y:1994 05 1994 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $305,320 $1,140,000 Not Implemented
OK0426 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,558 $3,224 Implemented
OK0426 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,281 $3,318 Implemented
OK0426 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $999 $900 Implemented
OK0426 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $315 $0 Implemented
OK0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $572 $741 Not Implemented
OK0426 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $358 $0 Implemented
OK0426 # 07 Y:1994 07 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $178 $0 Implemented
OK0426 # 08 Y:1994 08 1994 USE PHOTOCELL CONTROLS $124 $200 Implemented
OK0426 # 09 Y:1994 09 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $104 $317 Not Implemented
ME0123 # 01 Y:1994 01 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $500 Implemented
ME0123 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,038 $1,500 Implemented
ME0123 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $722 $500 Not Implemented
ME0123 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $816 $750 Not Implemented
ME0123 # 05 Y:1994 05 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $21,216 $52,000 Not Implemented
SD0074 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,284 $4,840 Implemented
SD0074 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $8,666 $4,290 Implemented