IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

350

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0201 # 06 Y:1983 06 1983 MODIFY TEXTILE DRYERS $33,809 $35,000 Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0192 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $940 $200 Implemented
KU0110 # 02 Y:1983 02 1983 INSTALL AUTOMATIC STACK DAMPER $1,012 $800 Implemented
TN0192 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,800 $0 Implemented
KU0110 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,606 $4,200 Implemented
GT0201 # 05 Y:1983 05 1983 MODIFY DYE BECK $38,740 $51,000 Implemented
GT0201 # 04 Y:1983 04 1983 MODIFY DYE BECK $58,597 $101,000 Implemented
GT0201 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $22,837 $10,000 Implemented
GT0201 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,745 $50,000 Implemented
GT0201 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,132 $500 Implemented
GT0201 # 08 Y:1983 08 1983 REPAIR AND ELIMINATE STEAM LEAKS $4,897 $400 Implemented
GT0201 # 07 Y:1983 07 1983 CONTROL PRESSURE ON STEAMER OPERATIONS $7,770 $3,500 Implemented
TN0190 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60 $0 Implemented
GT0201 # 09 Y:1983 09 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,028 $4,000 Implemented
UD0111 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $928 $1,200 Implemented
TN0192 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $325 $12,000 Implemented
KU0111 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $200 Implemented
TN0190 # 02 Y:1983 02 1983 INSTALL SET-BACK TIMERS $1,000 $0 Implemented
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
TN0191 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,027 $10,000 Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
KU0110 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $465 $3,000 Implemented
TN0190 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,800 $300 Implemented
TN0191 # 02 Y:1983 02 1983 USE RADIANT HEATER FOR SPOT HEATING $3,251 $5,000 Implemented