IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0659 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $22,711 n/a
GT0659 # 02 Y:1999 02 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,484 $0 n/a
GT0659 # 04 Y:1999 04 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,123 $400 n/a
GT0659 # 01 Y:1999 01 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $88,180 $220,000 n/a
GT0659 # 06 Y:1999 06 1999 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $45,013 $120,000 n/a
TN0648 # 10 Y:1999 10 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,645 $19,080 Not Implemented
TN0648 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $12,600 $6,880 Not Implemented
TN0648 # 02 Y:1999 02 1999 INCREASE AMOUNT OF CONDENSATE RETURNED $197,660 $27,450 Implemented
UF0240 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $983 $0 Implemented
UF0240 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $184 $0 Implemented
UF0240 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,086 $0 Implemented
TN0652 # 09 Y:1999 09 1999 REPAIR AND ELIMINATE STEAM LEAKS $28,970 $300 Not Implemented
TN0652 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $4,000 Implemented
TN0652 # 08 Y:1999 08 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $96,250 $400,000 Not Implemented
TN0652 # 02 Y:1999 02 1999 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $34,710 $27,240 Not Implemented
TN0652 # 10 Y:1999 10 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,210 $10,000 Not Implemented
TN0652 # 06 Y:1999 06 1999 REPAIR AND ELIMINATE STEAM LEAKS $4,000 $100 Implemented
OD0150 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $3,660 Not Implemented
OD0150 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $402 $20 Not Implemented
OD0150 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $370 $400 Not Implemented
OD0150 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,354 $9,564 Not Implemented
GT0678 # 08 Y:1999 08 1999 COMBINE UTILITY METERS $7,560 $7,500 Not Implemented
GT0678 # 02 Y:1999 02 1999 REDUCE EXCESSIVE BOILER BLOWDOWN $920 $900 Not Implemented
GT0678 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,447 $21,000 Not Implemented
GT0678 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,185 $120,000 Not Implemented