IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,747

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0561 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,380 $270 Not Implemented
CO0561 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,460 $29,920 Not Implemented
CO0561 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $240 $480 Not Implemented
CO0561 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $10,440 $90,000 Not Implemented
CO0561 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,890 $4,100 Not Implemented
CO0561 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $2,760 Not Implemented
CO0561 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $640 $960 Not Implemented
CO0559 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,760 $2,260 Implemented
CO0559 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,190 $740 Implemented
CO0559 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $650 $4,550 Not Implemented
CO0559 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $416 Implemented
CO0559 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $292 Implemented
CO0559 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $710 $1,790 Implemented
CO0559 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,070 $440 Implemented
CO0559 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,180 $810 Implemented
CO0560 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $990 $800 Not Implemented
CO0560 # 09 Y:2004 09 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,800 $10,610 Not Implemented
CO0560 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,210 $0 Not Implemented
CO0560 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,230 $130 Implemented
CO0560 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,520 $160 Implemented
CO0560 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $1,180 Implemented
CO0560 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,190 $17,400 Not Implemented
CO0560 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
CO0560 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,390 $15,681 Implemented
CO0560 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $944 Implemented