IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

316

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0064 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $1,405 Implemented
OK0064 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $400 Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
OK0064 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,749 $560 Implemented
OK0066 # 08 Y:1982 08 1982 INSTALL TIMERS AND/OR THERMOSTATS $69 $296 Implemented
TN0165 # 04 Y:1982 04 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,920 $500 Implemented
OK0066 # 02 Y:1982 02 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $973 $633 Implemented
UD0066 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $769 $0 Implemented
OK0067 # 04 Y:1982 04 1982 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $82,335 $19,850 Implemented
UD0066 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,419 $2,525 Implemented
UD0070 # 03 Y:1982 03 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,079 $15,000 Implemented
OK0067 # 07 Y:1982 07 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,311 $147 Implemented
GT0142 # 02 Y:1982 02 1982 MODIFY TEXTILE DRYERS $2,578 $0 Implemented
OK0064 # 05 Y:1982 05 1982 INSTALL TIMERS AND/OR THERMOSTATS $485 $0 Implemented
OK0064 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $707 $56 Implemented
UD0070 # 02 Y:1982 02 1982 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,051 $10,000 Implemented
OK0067 # 13 Y:1982 13 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $508 $300 Implemented
OK0067 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $5,689 $2,430 Implemented
TN0165 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $2,132 $200 Implemented
UD0065 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $662 $200 Implemented
OK0067 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $63,919 $3,400 Implemented
OK0067 # 08 Y:1982 08 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $113 $91 Implemented
UD0066 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $147 $0 Implemented
OK0064 # 06 Y:1982 06 1982 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $586 $0 Implemented
GT0142 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,895 $500 Implemented