IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
ARC 2.72 SPACE CONDITIONING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0394 # 07 Y:2006 07 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $12,995 $1,250 Not Implemented
IC0124 # 04 Y:2006 04 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,565 $0 Not Implemented
TA0128 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,032 $10,650 Not Implemented
MS0307 # 02 Y:2006 02 2006 USE RADIANT HEATER FOR SPOT HEATING $8,652 $7,384 Implemented
MI0141 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,681 $160 Not Implemented
IC0122 # 04 Y:2006 04 2006 INSTALL TIMERS AND/OR THERMOSTATS $2,700 $0 Implemented
CO0595 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,170 $40,400 Not Implemented
CO0595 # 07 Y:2006 07 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,810 $23,490 Not Implemented
OR0510 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,000 $11,600 Not Implemented
UU0111 # 06 Y:2006 06 2006 USE RADIANT HEATER FOR SPOT HEATING $3,330 $17,000 Not Implemented
UU0110 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,350 $6,900 Not Implemented
UM0314 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $62,424 $69,750 Not Implemented
SU0243 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,077 $0 Implemented
UU0109 # 06 Y:2006 06 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $32,510 $249,000 Not Implemented
IC0121 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,185 $115,000 Not Implemented
CO0594 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,200 $5,050 Not Implemented
UM0312 # 05 Y:2006 05 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,885 $2,250 Implemented
WV0352 # 03 Y:2006 03 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,862 $3,440 Implemented
WV0351 # 01 Y:2006 01 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,565 $20,410 Implemented
LE0246 # 05 Y:2006 05 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,033 $5,000 Implemented
SF0336 # 01 Y:2006 01 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16 $0 Implemented
SF0336 # 03 Y:2006 03 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $882 $24,000 Not Implemented
IA0398 # 10 Y:2006 10 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $16,927 $4,400 Not Implemented
IC0119 # 08 Y:2006 08 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,353 $312,000 Not Implemented
UM0310 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,000 $14,850 Implemented