Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
387
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0780 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,772 | $500 | Implemented |
GT0780 # 10 Y:2004 | 10 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $12,344 | $20,000 | Not Implemented |
GT0780 # 02 Y:2004 | 02 | 2004 | INSTALL TURBULATORS | $11,482 | $12,800 | n/a |
GT0780 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,654 | $10,261 | Implemented |
GT0780 # 07 Y:2004 | 07 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,729 | $1,209 | Implemented |
GT0780 # 01 Y:2004 | 01 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,020 | $11,903 | Implemented |
GT0780 # 06 Y:2004 | 06 | 2004 | COMBINE UTILITY METERS | $23,320 | $0 | Not Implemented |
GT0780 # 09 Y:2004 | 09 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,453 | $900 | Implemented |
GT0780 # 12 Y:2004 | 12 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $2,490 | $800 | Implemented |
GT0780 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $25,046 | $92,125 | Not Implemented |
GT0780 # 11 Y:2004 | 11 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,325 | $1,600 | Not Implemented |
GT0780 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,512 | $0 | Not Implemented |
GT0759 # 07 Y:2003 | 07 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $5,960 | $2,190 | Implemented |
GT0759 # 06 Y:2003 | 06 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $287,380 | $24,500 | n/a |
GT0759 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $770,950 | $340,200 | Not Implemented |
GT0759 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $157,690 | $210,000 | n/a |
GT0759 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $200,910 | $20,900 | n/a |
GT0759 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $89,620 | $108,930 | Implemented |
GT0759 # 01 Y:2003 | 01 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $5,870 | $3,000 | Implemented |
GT0759 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,765 | $188,200 | Implemented |
GT0743 # 01 Y:2002 | 01 | 2002 | USE MINIMUM STEAM OPERATING PRESSURE | $1,259 | $0 | Implemented |
GT0743 # 02 Y:2002 | 02 | 2002 | OPERATE BOILERS ON HIGH FIRE SETTING | $5,598 | $0 | Not Implemented |
GT0743 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,206 | $17,240 | Not Implemented |
GT0743 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,792 | $5,050 | Not Implemented |
GT0743 # 04 Y:2002 | 04 | 2002 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $10,781 | $1,720 | Implemented |