IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0339 # 02 Y:2010 02 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $204,298 $966,460 Implemented
LL0339 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $271,505 $2,920 Implemented
LL0339 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $152,895 $42,400 Implemented
LL0335 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $313 $123 Implemented
LL0335 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,558 $4,290 Implemented
LL0333 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $288,465 $36,500 Implemented
LL0333 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,966 $5,315 Implemented
LL0333 # 01 Y:2010 01 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,585,020 $273,500 Implemented
LL0330 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $132,650 $40,600 Implemented
LL0330 # 03 Y:2010 03 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,865 $750 Implemented
LL0330 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $138,978 $13,140 Implemented
LL0326 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $31,166 $6,970 Implemented
LL0326 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,220 $15,480 Implemented
LL0326 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $13,685 $3,250 Implemented
LL0324 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $51,066 $5,850 Implemented
LL0318 # 03 Y:2009 03 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,250 $1,410 Implemented
LL0318 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $208,490 $16,797 Implemented
LL0318 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,944 $8,910 Implemented
LL0318 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $818 $525 Implemented
LL0318 # 07 Y:2009 07 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $67 $156 Implemented
LL0315 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,718 $300 Implemented
LL0315 # 05 Y:2009 05 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $193 $1,020 Implemented
LL0315 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,024 $4,200 Implemented
LL0314 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $149,374 $64,560 Implemented
LL0314 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $770 Implemented