IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0158 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $3,066 $1,964 Implemented
RU0158 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $416 Implemented
RU0158 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,599 $0 Implemented
RU0159 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $0 Implemented
RU0158 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,516 $0 Implemented
RU0159 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,157 $567 Implemented
RU0158 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $1,455 $800 Implemented
RU0145 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $571 Implemented
RU0145 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,099 $0 Implemented
RU0145 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,086 $3,500 Implemented
RU0145 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $500 Implemented
RU0137 # 01 Y:1992 01 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $680 $426 Implemented
RU0144 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $479 Implemented
RU0137 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $476 $500 Implemented
RU0137 # 06 Y:1992 06 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,441 $0 Implemented
RU0144 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $66 Implemented
RU0137 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $2,197 Implemented
RU0135 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $1,860 Implemented
RU0135 # 04 Y:1991 04 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,507 $2,500 Implemented
RU0135 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,125 $0 Implemented
RU0123 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,611 $0 Implemented
RU0123 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,413 $272 Implemented
RU0123 # 03 Y:1991 03 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,866 $46,704 Implemented
RU0123 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,390 $5,320 Implemented
RU0121 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $267 Implemented