Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0259 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,827 $1,000 Implemented
UA0259 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $50,082 $26,090 Implemented
UA0237 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,075 $9,020 Implemented
UA0237 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,741 $78,276 Implemented
UA0237 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,989 $50 Implemented
UA0237 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $985 $141 Implemented
UA0237 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,431 $551 Implemented
UA0214 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,341 $8,495 Implemented
UA0214 # 09 Y:2019 09 2019 PAY UTILITY BILLS ON TIME $9,417 $0 Implemented
UA0214 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $57,024 $7,375 Implemented
UA0214 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,824 $6,704 Implemented
UA0214 # 04 Y:2019 04 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $48,099 $7,241 Implemented
UA0214 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $22,118 $50 Implemented
UA0214 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,674 $35,762 Implemented
UA0213 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,549 $1,294 Implemented
UA0213 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,098 $4,895 Implemented
UA0202 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,888 $1,345 Implemented
UA0202 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,356 $100 Implemented
UA0202 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,355 $39,669 Implemented
UA0202 # 04 Y:2019 04 2019 INSTALL TIMERS AND/OR THERMOSTATS $29,377 $15 Implemented
UA0202 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $4,359 $17,407 Implemented
UA0181 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $3,255 $1,850 Implemented
UA0181 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,999 $2,465 Implemented
UA0181 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $5,103 $11,746 Implemented
UA0171 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,758 $0 Implemented