IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157,957

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0553 # 05 Y:2020 05 2020 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $2,236 $0 Implemented
SF0558 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $0 Implemented
SF0558 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $98,999 $34,416 Implemented
SF0558 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,186 $525 Not Implemented
SF0558 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,252 $4,542 Implemented
SF0558 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,759 $2,995 Implemented
SF0558 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $282 $379 Implemented
SF0558 # 07 Y:2020 07 2020 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $30,342 $50,211 Not Implemented
SF0558 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,149 $6,701 Not Implemented
SF0558 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $591 Implemented
SF0558 # 10 Y:2020 10 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $9,006 $75,000 Not Implemented
OK1035 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,099 $5,247 Implemented
OK1035 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,472 $6,388 Implemented
OK1035 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,459 $8,757 Not Implemented
OK1035 # 04 Y:2020 04 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,243 $4,000 Implemented
OK1035 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,774 $0 Not Implemented
NC0653 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,814 $4,460 Not Implemented
NC0653 # 02 Y:2020 02 2020 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $22,483 $4,000 Not Implemented
NC0653 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $382,429 $2,300,000 Not Implemented
IP0140 # 01 Y:2020 01 2020 PAY BILLS ON TIME TO AVOID LATE FEES $266 $0 Not Implemented
IP0140 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $578 $0 Not Implemented
IP0140 # 03 Y:2020 03 2020 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,697 $0 Not Implemented
IP0140 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $842 $176 Not Implemented
IP0140 # 05 Y:2020 05 2020 APPLY FOR INVESTMENT INCENTIVES $26,189 $10,000 Not Implemented
IP0140 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $122 $45 Not Implemented