IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0151 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,055 $2,536 Not Implemented
BS0151 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $272 $522 Not Implemented
BS0151 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $8,310 $527 Not Implemented
BS0151 # 02 Y:2021 02 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $893 $710 Not Implemented
BS0150 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $937 $22 Not Implemented
BS0150 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $629 $375 Not Implemented
BS0150 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $151 $180 Not Implemented
BS0150 # 04 Y:2021 04 2021 INSTALL SKYLIGHTS $254 $2,020 Not Implemented
BS0150 # 05 Y:2021 05 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $682 $1,180 Not Implemented
BS0149 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,317 $313 Not Implemented
BS0149 # 01 Y:2021 01 2021 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $9,819 $23 Not Implemented
BS0149 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $23,678 $1,000 Not Implemented
BS0149 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,150 $13,435 Not Implemented
BS0149 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,525 $50 Not Implemented
BS0148 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $11,112 $50,404 Not Implemented
BS0148 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,220 $24,000 Not Implemented
BS0148 # 03 Y:2021 03 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $445 $649 Not Implemented
BS0148 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,298 $600 Not Implemented
BS0113 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,211 $360 Not Implemented
BS0113 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,656 $2,640 Not Implemented
BS0113 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $100 Not Implemented
BS0113 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $193 Not Implemented
BS0111 # 02 Y:2018 02 2018 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $768 $1,485 Implemented
BS0111 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,853 $2,250 Implemented
BS0111 # 07 Y:2018 07 2018 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $130,754 $100,744 Not Implemented